Simon air management systems

Simon logo

Simon Panel Louvre Range

product code:Spl Range


louvre

Description:


The basic requirement for a louvre is to move air in and around a building, thereby creating added comfort and convenience for better living.

Our louvre system comes with various blade types and numerous frame choices that allow their use as an integral part of a window system or separately as a stand-alone louvre.

Blades and frame are made from extruded aluminium for greater strength and accuracy.

OUTER FRAME OPTIONS


  • Glazed-In
  • Flanged
  • Surface Mounted

Specification:


Type MR20V Blade

Blade pitch: 20mm.
Blade height: 20mm.
Glazing thickness: 20mm.24 and 28mm glazing.
Rebate size: 18mm.

Type MR34Z Blade

Blade pitch: 34mm.
Blade height: 39mm.
Glazing thickness: 20mm.24 and 28mm glazing.
Rebate size: 18mm.

Type MR34V Blade

Blade pitch: 34mm.
Blade height: 39mm.
Glazing thickness: 24 and 28mm glazing.
Rebate size: 22mm.

Type MR50Z Blade

Blade pitch: 34mm.
Blade height: 39mm.
Glazing thickness: 24mm ONLY.
Rebate size: 22mm.

Design Criteria:


Finishing

  • Polyester Powder Coated to BS6496 - 60 to 80 microns.
  • All standard RAL colours are also available
  • Anodised finishes on request only.

Frame Options

  • 3 option available - Glazed-In, Flanged and Surface Mounted
  • To enhance weather performance an aluminium drainage profile can be fitted to the bottom of the unit.

Fixing

  • Glazed-In - Glazing blocks and beads
  • Surface Mounted and Flanged - Directly screwed in to building.

Performance:


Type MR20V

Visual Free Area of 94%
Physical Free Area of 30%

Type MR34Z

Visual Free Area of 68%
Physical Free Area of 35%

Type MR34V

Visual Free Area of 60%
Physical Free Area of 50%

Type MR50Z

Visual Free Area of 78%
Physical Free Area of 48%

Manufacture:


Made to measure.

A reinforcement profile carrying extra blade supports is fitted when the width of the louvre is over 700mm wide.

A nylon insect mesh fitted as standard with astainless steel mesh (optional) is fitted to the back of the louvre unit

Assembly & Maintenance:


All units and manufactured under ISO 9001 quality management system.

latest news

ENGLAND & WALES BUILDING REGULATIONS UPDATED FOR 2010. England & Wales ADF and ADL 2010 News
view
2010 Scottish Building Regulations Update 2010 Scottish Regulations Update
view
Greenbuild Manchester Exhibition Greenbuild Manchester Exhibition
view

newsletter

sign up for our newsletter